Minimization of direct costs in the construction of torrent control structures
Апстракт
The most important elements in the planning of the implementation of the torrent (flood) control projects which need to be estimated are time, costs (budget) and resource required. These three elements are interactive: a shorter duration of structure construction causes additional resources engagement and increased costs, and vice versa - greater costs provide a shorter duration of construction. This paper analysis direct project cost minimization for four torrent control projects. The construction duration and the dynamic plan of project activities have been determined using the CPM method of network planning. The optimization problem - minimization of direct cost of construction subject to constraints such as: given deadline, precedence constraints, and upper and lower bounded duration time of activities is solved using linear programming and Matlab toolbox. Our results show that applied methods ensure significant cost savings, which is an important challenge in the construction mana...gement.
Кључне речи:
torrent control / linear programming / CPM method / cost minimizationИзвор:
Tehnički vjesnik, 2017, 24, 4, 1123-1128Издавач:
- Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
Финансирање / пројекти:
- Истраживање климатских промена и њиховог утицаја на животну средину - праћење утицаја, адаптација и ублажавање (RS-MESTD-Integrated and Interdisciplinary Research (IIR or III)-43007)
Институција/група
Šumarski fakultetTY - JOUR AU - Dragović, Nada AU - Vulević, Tijana AU - Todosijević, Mirjana AU - Kostadinov, Stanimir AU - Zlatić, Miodrag PY - 2017 UR - https://omorika.sfb.bg.ac.rs/handle/123456789/808 AB - The most important elements in the planning of the implementation of the torrent (flood) control projects which need to be estimated are time, costs (budget) and resource required. These three elements are interactive: a shorter duration of structure construction causes additional resources engagement and increased costs, and vice versa - greater costs provide a shorter duration of construction. This paper analysis direct project cost minimization for four torrent control projects. The construction duration and the dynamic plan of project activities have been determined using the CPM method of network planning. The optimization problem - minimization of direct cost of construction subject to constraints such as: given deadline, precedence constraints, and upper and lower bounded duration time of activities is solved using linear programming and Matlab toolbox. Our results show that applied methods ensure significant cost savings, which is an important challenge in the construction management. PB - Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek T2 - Tehnički vjesnik T1 - Minimization of direct costs in the construction of torrent control structures EP - 1128 IS - 4 SP - 1123 VL - 24 UR - conv_2392 ER -
@article{ author = "Dragović, Nada and Vulević, Tijana and Todosijević, Mirjana and Kostadinov, Stanimir and Zlatić, Miodrag", year = "2017", abstract = "The most important elements in the planning of the implementation of the torrent (flood) control projects which need to be estimated are time, costs (budget) and resource required. These three elements are interactive: a shorter duration of structure construction causes additional resources engagement and increased costs, and vice versa - greater costs provide a shorter duration of construction. This paper analysis direct project cost minimization for four torrent control projects. The construction duration and the dynamic plan of project activities have been determined using the CPM method of network planning. The optimization problem - minimization of direct cost of construction subject to constraints such as: given deadline, precedence constraints, and upper and lower bounded duration time of activities is solved using linear programming and Matlab toolbox. Our results show that applied methods ensure significant cost savings, which is an important challenge in the construction management.", publisher = "Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek", journal = "Tehnički vjesnik", title = "Minimization of direct costs in the construction of torrent control structures", pages = "1128-1123", number = "4", volume = "24", url = "conv_2392" }
Dragović, N., Vulević, T., Todosijević, M., Kostadinov, S.,& Zlatić, M.. (2017). Minimization of direct costs in the construction of torrent control structures. in Tehnički vjesnik Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek., 24(4), 1123-1128. conv_2392
Dragović N, Vulević T, Todosijević M, Kostadinov S, Zlatić M. Minimization of direct costs in the construction of torrent control structures. in Tehnički vjesnik. 2017;24(4):1123-1128. conv_2392 .
Dragović, Nada, Vulević, Tijana, Todosijević, Mirjana, Kostadinov, Stanimir, Zlatić, Miodrag, "Minimization of direct costs in the construction of torrent control structures" in Tehnički vjesnik, 24, no. 4 (2017):1123-1128, conv_2392 .